June

As predicted, lots completed this month:

The flick 2b Bell pit 1d Bell pit 2b Wooden box 2aMonument to the last tree 2 Esther 2 Residency under construction 3Landscape 1c Landscape 2d Landscape 3c

This entry was posted in Monthy Output. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *